THE SHORT ANSWER

Duration helps size price risk; it does not tell you how many years to wait or guarantee recovery of losses.

Investors comparing interest-rate sensitivity across fixed-income portfolios.

Duration is not maturity

FINRA links higher duration to greater price sensitivity to rates. For a modified-duration approximation, multiply duration by the yield change in decimal form and reverse the sign. This is a local calculation: it does not represent every bond risk.

Reference: FINRA · Interest Rate Changes and Duration ↗

Build a test, not a forecast

Use the exact measure and date from the fact sheet. Do not interchange modified, Macaulay and effective duration without understanding their differences. Test both a rate rise and a decline. For large moves, convexity, options and portfolio changes can make the linear approximation inaccurate.

Compare the hypothetical loss with cash you might need to withdraw soon. Separately consider credit risk, currency, fees and liquidity. A coupon does not prevent price declines; nor should you automatically add an annual coupon to a price change measured over another period.

HYPOTHETICAL EXAMPLE

Two sensitivities on the same capital

Fictional example. Portfolio US$20,000; modified duration 4.5; assumed parallel yield rise of 0.75 percentage points.

  1. Approximate change: −4.5 × 0.0075 = −0.03375, or −3.375%.
  2. Estimated loss: 20,000 × 0.03375 = US$675. With duration 2: 20,000 × 2 × 0.0075 = US$300.

The US$375 difference measures this assumed shock, not one portfolio’s overall superiority.

Illustrative MisSoles calculation. Not a quote or a promised return.

Mistakes you can avoid

  • Entering 0.75 instead of 0.0075.
  • Interpreting the test as the maximum possible loss.

Your next step

  1. Verify duration type and date.
  2. Test a near-term withdrawal after the shock.

Research scope

Content updated: 2026-11-25 · Partial review

  • Does not model convexity, default, nonparallel moves or total return.

AI-assisted writing; independent editorial review pending. Examples and decision frameworks are developed by MisSoles.

Sources, dates and coverage · 1
  • Interest Rate Changes and Duration · FINRA

    Read: 2026-11-25 · Read November 25, 2026; retain source date and scope.

    Approximate sensitivity to rate changes.

    The source supports the stated concept, not a quote, contract or personal situation. Scenarios and calculations are original.

Try your own numbers

Open related tool →

Keep learning