Full scope review remains incomplete. Individual restart determination and specific consequences.
Does not certify unresolved points. Author: AI-assisted draft; partial independent review.Fourth category: three decisions
Separate receipt withholding, monthly exception and advance. A forecast is not a suspension authorization.
Formula and scope
anticipo = 8% × cuarta cobrada − retenciones aplicables; excepción mensual se evalúa con cuarta + quinta
Method missoles-2026.1. Decimal arithmetic, final half-up rounding to two decimal places. Provider and SUNAT rounding may differ.
Save on this device
Your figures stay here. Each copy pins its data and method.
Step by step
- Update collected and expected income.
- Review projected tax and actual credits.
- If restart is required, check withholding and advance timing separately.
Worked example
A new contract may raise the projection before collection; an alert requests review, not claims that a return was filed.
Synthetic personal facts. Check regime, period and base before applying the calculation.
What is often overlooked
Comparing one month with the annual threshold is insufficient.
Timing and conditions
The rule distinguishes the advance tax period from the day withholding restarts.
Start here
Review the calculation and inputs →Sources and copyable citation · 2
- R.S.013-2007/SUNAT · SUNAT
Read: 2026-11-18 · Effective period: Structural rule; use 2026 overlay
Suspension uses FV 1609 and authorization, with multiple eligibility routes. Withholding effect starts next calendar day; advance effect starts authorization tax period; ordinary validity ends calendar year, subject restart. Restart depends on changed income and insufficiency of credits against annual tax. Declaration and payment exceptions are separate questions.
- Income Tax Law Chapter XI · SUNAT
Read: 2026-11-18 · Effective period: 2026 scenario
Fourth advance 8% of relevant gross income; actual retentions credit separately. Annual balance compares tax with actual credits; excess is not an approved refund.
MisSoles. When to review or restart withholding and advances after suspension. 2026-11-18. partial. https://missoles-pe.gyac21.workers.dev/en/guides/restart-after-suspension/. Method: missoles-2026.1.